What happens to the Fun Fair Proceeds?
Fun Fair proceeds along with monies raised from CJF HSA events and Parishioner donations is what makes our Parish better every year
2025
- Cardinal John Foley School
- Pre-K Hallway received new tile floor
- Pre-K girls bathroom - all new plumbing, ceramic tile, lighting and partition system. Removed steps
- Middle School (6th - 8th) classrooms - replaced 1950s lights, new floors, lockers and furniture systems; portable Smartpanels, repainted whole floor. (Fifth grade classrooms same as 6th-8th except no new furniture)
- Six new rooftop AC units for 5th through 8th grade classrooms.
- Replaced original 1950s electrical service equipment in Annunciation Hall; built in capacity for future AC expansion
- AC also added to faculty room and the newly relocated principal’s office.
- Gym floor re-finished
- Pit fence line asphalt repairs
- St. Denis Parish Grounds
- Completion of rectory parking lot and cemetery road paving.
- Installation of Bicentennial Bricks and new stamped concrete patio in front of Attic Treasures building
- Clearing of clogged underground drainage line system for rectory and church roofs



2024
- Cardinal John Foley School
- Media Center : complete remodel (new equipment, flooring, lighting; air conditioning added)
- Constructed two new Classrooms 106 (Pre-K) and 116 (Kindergarten)
- Gymnasium lighting upgraded to LED (cut energy consumption in half!)
- Electrical circuit rewiring and panel box upgrades first floor of St Denis Hall building
- Cafeteria - Ceiling fans added; replaced tables w/ round tables; repainted; new PA system
- Extensions of waterproofing system in basement of Pre-K rooms
- New Flooring: St Denis Hall building Pre-K area and 1st Floor hallways
- School-wide upgraded of Wi-Fi system for improved internet access
- School-wide telephone system replacement
- Added backup power systems for Ethernet/PA/Phone Equipment
- Computer Network Server upgraded
- School-wide various furniture upgrades (shelving, teacher desks, area carpets)
- Partial school yard pavement sealing
- Gymnasium Floor - cleaned and recoated with floor finish; protective mat system steam-cleaned
- Tree Trimming and landscaping clean up along school property lines.
- Complete repainting of top floor of Annunciation BVM building


2023
- Cardinal John Foley School
- Complete Renovation of Pre-K rooms 101 and 102, including new wiring, lighting, walls, suspended ceilings, heating, floors; and installation of foundation waterproofing system.
- Flooring replacements in various classrooms and hallways, both buildings.
- Electrical feeder replacements in basement and of St Denis Hall building.
- Whole-building electrical surge suppression installed.
- Replacement of Smartboards/Projectors with Promethean Panels – All Classrooms.
- Installation of backup power supplies for computer Network upgrades
- Migration from Comcast to FIOS Internet Service Provider
- Playground renovation – Installed rubber pour-in-place surfacing system to replace wood chips
- Basement rear workroom renovation.

2020 - 2022
- Cardinal John Foley School
- Ongoing renovations to school restrooms. Completed St D Hall full restroom renovations 1st and 2nd floors.
- Flooring replacements in various classrooms and hallways, both buildings.
- St Denis Hall Classroom remodel 1st and 2nd floor – new wiring, suspended ceilings, LED lighting and painting.
- Completed the replacement of windows in both Annunciation Hall and St Denis Hall Buildings
- Basement Music Director office and copier room renovation and waterproofing