What happens to the Fun Fair Proceeds?

Fun Fair proceeds along with monies raised from CJF HSA events and Parishioner donations is what makes our Parish better every year

2025

  • Cardinal John Foley School
    • Pre-K Hallway received new tile floor
    • Pre-K girls bathroom - all new plumbing, ceramic tile, lighting and partition system. Removed steps
    • Middle School (6th - 8th) classrooms - replaced 1950s lights, new floors, lockers and furniture systems; portable Smartpanels, repainted whole floor. (Fifth grade classrooms same as 6th-8th except no new furniture)
    • Six new rooftop AC units for 5th through 8th grade classrooms.
    • Replaced original 1950s electrical service equipment in Annunciation Hall; built in capacity for future AC expansion
    • AC also added to faculty room and the newly relocated principal’s office.
    • Gym floor re-finished
    • Pit fence line asphalt repairs
  • St. Denis Parish Grounds
    • Completion of rectory parking lot and cemetery road paving.
    • Installation of Bicentennial Bricks and new stamped concrete patio in front of Attic Treasures building
    • Clearing of clogged underground drainage line system for rectory and church roofs
Image
Image
Image

2024

  • Cardinal John Foley School
    • Media Center : complete remodel (new equipment, flooring, lighting; air conditioning added)
    • Constructed two new Classrooms 106 (Pre-K) and 116 (Kindergarten)
    • Gymnasium lighting upgraded to LED (cut energy consumption in half!)
    • Electrical circuit rewiring and panel box upgrades first floor of St Denis Hall building
    • Cafeteria - Ceiling fans added; replaced tables w/ round tables; repainted; new PA system
    • Extensions of waterproofing system in basement of Pre-K rooms
    • New Flooring: St Denis Hall building Pre-K area and 1st Floor hallways
    • School-wide upgraded of Wi-Fi system for improved internet access
    • School-wide telephone system replacement
    • Added backup power systems for Ethernet/PA/Phone Equipment
    • Computer Network Server upgraded
    • School-wide various furniture upgrades (shelving, teacher desks, area carpets)
    • Partial school yard pavement sealing
    • Gymnasium Floor - cleaned and recoated with floor finish; protective mat system steam-cleaned
    • Tree Trimming and landscaping clean up along school property lines.
    • Complete repainting of top floor of Annunciation BVM building
Image
Image

2023

  • Cardinal John Foley School
    • Complete Renovation of Pre-K rooms 101 and 102, including new wiring, lighting, walls, suspended ceilings, heating, floors; and installation of foundation waterproofing system.
    • Flooring replacements in various classrooms and hallways, both buildings.
    • Electrical feeder replacements in basement and of St Denis Hall building.
    • Whole-building electrical surge suppression installed.
    • Replacement of Smartboards/Projectors with Promethean Panels – All Classrooms.
    • Installation of backup power supplies for computer Network upgrades
    • Migration from Comcast to FIOS Internet Service Provider
    • Playground renovation – Installed rubber pour-in-place surfacing system to replace wood chips
    • Basement rear workroom renovation.
Image

2020 - 2022

  • Cardinal John Foley School
    • Ongoing renovations to school restrooms. Completed St D Hall full restroom renovations 1st and 2nd floors.
    • Flooring replacements in various classrooms and hallways, both buildings.
    • St Denis Hall Classroom remodel 1st and 2nd floor – new wiring, suspended ceilings, LED lighting and painting.
    • Completed the replacement of windows in both Annunciation Hall and St Denis Hall Buildings
    • Basement Music Director office and copier room renovation and waterproofing